NAMBIAR DISTRICT 25 PHASE 3 — New Project Coming Up in Sarjapur Road, Bangalore
Phase 3 Launch: Expanding a 200-Acre Township
Nambiar District 25 is a 200-acre RERA township with 50% greenery, located at Muthanallur Cross, Sarjapur Road. The newly launched Phase 3 features 6 towers presenting villa-style 2 BHK, 3 BHK, 4 BHK, and 4.5 BHK residences with spacious balconies overlooking open spaces dotted with 3,500+ trees. Phase 3 comprises 1,200 units with prices starting from ₹1.7 Cr onwards.
Unit Mix and Sizing
None of the apartments in this enclave shares walls, and each one has a garbage chute for ease of living. The tower configurations include options across multiple bedroom formats, with 85% open space and 40% Mother Earth untouched with 3,500+ trees proposed to be planted.
Master Plan and Scale
The 100-acre integrated township is located at Chandapura-Dommasandra Road, around 1 km off the main Sarjapur Road. Two phases are already launched—Phase 1 (796 homes, 6 towers) and Phase 2 (816 homes, 6 towers), across varying BHK formats with only 4 units per floor.
Amenities and Recognition
Across Phase 1, 2, and 3, the total amenity count now stands north of 125, with the Sports District forming the newest and largest addition recognised recently when Nambiar District 25 won "Integrated Township of the Year" at the Times Business Awards 2025. The township features a grand clubhouse spread over 7.5 acres. A 4-km peripheral jogging and cycling track loops around the township, offering fitness without requiring a car ride.
Location and Connectivity
Residents are served by Carmelaram Railway Station, Sarjapur Marathahalli Road, and the Bangalore Mumbai Highway for commuting within and beyond city limits. The upcoming Muthanallur Metro Station is located just 500 metres away. The site is just 1 km from Sarjapur Main Road, with Muthanallur Cross serving as the junction that connects Sarjapur Road to the project. Access is via CD Road with a 100 ft wide approach road.
About Nambiar Builders
Nambiar Builders is a Bengaluru company that has been around since 2009. The company was founded with a clear vision to redefine residential development through integrity, thoughtful design, and enduring value, focusing on building premium communities in South-East Bangalore, especially around Sarjapur. Ellegenza, a villa project, reimagined villa living for the modern buyer with a gated enclave, signature design, landscaped open spaces, and curated amenities.
Possession Timeline
Phase 1 possession target is February 2030 and Phase 2 September 2030. Phase 3 possession timelines align with the overall township build schedule.